Wet Areas & Bathrooms
Liquid-applied waterproofing under tiles in bathrooms, kitchens and wet rooms — thin, seamless and sealed at every corner and drain.

One System, Built to Work Together.
Wet areas fail at the details: corners, pipe penetrations and drains. Liquid-applied bituminous coatings wrap all of them seamlessly, curing into a continuous membrane that tiles bond to through the adhesive bed.
Insuguard and Insucoat emulsions roll onto prepared substrates in two coats, sealing floors and lower walls before tiling — the standard protection under every bathroom that stays dry.
- Bathrooms and shower rooms
- Kitchens and laundry areas
- Balconies before tiling
- Plant rooms and service areas
- Swimming pool surrounds
See the System in Action.
Layer by Layer.
- 01
Substrate Preparation
Surfaces cleaned and repaired; falls checked toward the floor drains.
- 02
First Emulsion Coat
The first coat works into corners, penetrations and the floor-wall junction.
- 03
Second Emulsion Coat
Applied perpendicular to the first for a continuous, pinhole-free film.
- 04
Tile Adhesive Bed
Cement adhesive bonds directly over the cured waterproof coating.
- 05
Tiling & Grout
The finished surface, sealed at joints and around every fixture.
Seamless at the Details
Liquid application wraps corners, drains and pipes with no cuts, laps or weak points.
Thin Build-Up
Millimetres of coating protect the room without raising floor levels or door thresholds.
Fast Between Trades
Roller-applied coats fit the fit-out schedule — tiling follows as soon as the film cures.
Tile-Ready Surface
Cement adhesives bond straight onto the cured coating for a fully bonded floor.
Common questions about this system.
Where is the Wet Areas & Bathrooms system used?
It is typically used for bathrooms and shower rooms, kitchens and laundry areas, balconies before tiling, plant rooms and service areas and swimming pool surrounds.
Which Insutech products are used for wet areas & bathrooms?
The recommended system is built with InsuGuard Rubber Base, InsuCoat Rubber Base, Insuseal and InsuStick — full details for each are on the recommended products cards on this page.
How is the system installed?
The system is installed in 5 stages: substrate Preparation, first Emulsion Coat, second Emulsion Coat, tile Adhesive Bed and tiling & Grout. The system build-up section on this page illustrates the full sequence. An application video is also available above.
What are the main advantages of the wet areas & bathrooms system?
The key advantages are seamless at the Details, thin Build-Up and fast Between Trades — each is explained in the Key Benefits section on this page.

















