Construction Waterproofing
Membrane systems for decks, podiums and structures across the construction programme — waterproofing engineered into the build, not added after it.

One System, Built to Work Together.
On major projects, waterproofing is a construction activity like any other — sequenced with the structure, inspected in stages and handed over trade to trade. The system must survive everything that happens above it later.
Insutech supplies the full membrane range with protection boards and coatings, letting contractors run one compatible waterproofing package across decks, podiums, planters and cores.
- Podium decks and transfer slabs
- Parking decks and ramps
- Planters and water features
- Cores, pits and service structures
- Phased mega-project programmes
See the System in Action.
Layer by Layer.
- 01
Structure Preparation
Decks and upstands prepared, with falls, fillets and details agreed per zone.
- 02
Bituminous Primer
Primed surfaces guarantee adhesion across large, phased pours.
- 03
Membrane System
APP or SBS membranes torch-applied per specification, layer by layer, zone by zone.
- 04
Protection Layer
Boards protect completed waterproofing while construction continues above.
- 05
Screeds & Build-Up
Following trades — screeds, finishes and landscaping — complete the works over a protected system.
One Package, Whole Project
Membranes, boards and coatings from one source keep every zone compatible and warrantable.
Survives the Programme
Protected systems shrug off the traffic, storage and trades of an active site.
Export-Grade Logistics
38M m² of annual capacity feeds phased deliveries on schedule, in Egypt and 105+ markets.
Certified Manufacture
CE-marked, ISO-certified production behind every roll on the project.
Common questions about this system.
Where is the Construction Waterproofing system used?
It is typically used for podium decks and transfer slabs, parking decks and ramps, planters and water features, cores, pits and service structures and phased mega-project programmes.
Which Insutech products are used for construction waterproofing?
The recommended system is built with InsuGrand, InsuUltra, InsuPoly and InsuPrene H — full details for each are on the recommended products cards on this page.
How is the system installed?
The system is installed in 5 stages: structure Preparation, bituminous Primer, membrane System, protection Layer and screeds & Build-Up. The system build-up section on this page illustrates the full sequence. An application video is also available above.
What are the main advantages of the construction waterproofing system?
The key advantages are one Package, Whole Project, survives the Programme and export-Grade Logistics — each is explained in the Key Benefits section on this page.